Time

Image rights: © PantherMedia /vicnt2815/Deugefin GmbH

Time

The time factor obviously plays a big role. Because the walls should be dried quickly and gently. Here comes Aquacontrol 102 in the game.


If the procedure is used correctly, measurable results can usually be seen after just 4 - 6 weeks. There is also a noticeable reduction in the smell and an improvement in the indoor climate. Damp edges on walls dry out.


Renovation can usually begin after about 3 - 5 months. After around 2000 hours of operation

Aquacontrol 102

Improvement values of up to 50% have been measured.

After 12 months, depending on the building structure and materials used, dry walls can be assumed in accordance with DIN 4108 (scientifically tolerated value for dry walls).