Image rights: © PantherMedia /vicnt2815/Deugefin GmbH
The time factor obviously plays a big role. Because the walls should be dried quickly and gently. Here comes Aquacontrol 102 in the game.
If the procedure is used correctly, measurable results can usually be seen after just 4 - 6 weeks. There is also a noticeable reduction in the smell and an improvement in the indoor climate. Damp edges on walls dry out.
Renovation can usually begin after about 3 - 5 months. After around 2000 hours of operation
Aquacontrol 102
Improvement values of up to 50% have been measured.
After 12 months, depending on the building structure and materials used, dry walls can be assumed in accordance with DIN 4108 (scientifically tolerated value for dry walls).
we ship insured via DHL
Financing is provided through our partner Deugefin GmbH from 2.75% eff. Annual interest rate conveyed. Conditions subject to change.
Only for people based in Germany.